Han Yu made a round at the construction site and eventually came to the six piping holes constantly gushing water and sand.
The diameter of the piping holes is continuously expanding, and the flow rate of the pipes is also increasing. The old engineer from Angong County Water Resources Bureau said that when they first arrived, mostly clear water was spouting out. Now, even with straw filtering, they still saw muddy water with sand.
The previously installed drainage pipes can no longer handle it; the water spouting out is about to overflow the newly elevated sandbag rimmed well.
Even if the water side of the dyke foot was not hollowed out by the flood, this still counts as a major hazard!
