As the hunting range expanded, a large amount of flesh and blood was brought back to the territory, and the breeding of the Wetland Lizard-men progressed rapidly.
8 squadrons have been converted halfway, with 4 squadrons remaining to await the arrival of flesh and blood.
Once the conversion is complete, the Cold-blooded Cavalry at hand will reach a scale of 25 squadrons!
Everything is developing steadily.
December 9th.
After discussing with a large group of Mud Swamp People, Bain officially finalized the Vine Track Project.
The core design features Micro City as its center, with tracks extending southeast, west, and north from the Swamp, with an additional track to the fortress city in the west.
The project officially broke ground on the day of finalization.
First, a large vine base station will be constructed within the territory, which will be the starting point for all vine tracks.
In the future, it will connect to all parts of the territory.
